Could the great classical music composer Ludwig Beethoven successfully implement analytics-based enterprise performance management (EPM) in an organization?
We will get to Beethoven in a minute. First, what do I mean by analytics-based enterprise performance management? I mean all of its integrated managerial methodologies. Examples are a strategy map and its companion balanced scorecard, dashboards, customer profitability and value management reporting, risk management, and driver-based financial rolling forecasts – with each one embedded with business analytics of all flavors such as segmentation and correlation analysis, and especially predictive analytics.
I was educated as an industrial engineer, and I do not view myself as a scholar of the performing arts, literature, or classical music. However I have always been a careful observer and listener of what I see and hear. As I continuously witness the success and failure of attempts to fully implement various enterprise performance management methodologies, I compare them with Beethoven. Why?
During Beethoven’s “middle period” of music composition he was attracted to heroes and heroic efforts. This was the time period around 1810 that he composed some of his most popularly recognized pieces such as Eroica (his Third Symphony), Egmont (from Goethe, and his Op. 84), and “Emperor” (piano concerto no. 5 in E-flat, Op. 73). What is common about Beethoven’s interest in heroics and champion-like project managers who take on the challenge to implement and integrate EPM’s methodologies? It is these three heroic phases: crisis, struggle, and triumph.
Crisis
The initiation of an EPM project, such as developing a balanced scorecard or a risk management system, may not result from a crisis. But you could liken usually quickly emerging organizational interest and eventual need in such a methodology to being a crisis situation. The spark typically occurs when an executive (or a champion or coalition of concerned managers) realizes disturbing deficiencies.
An example of these sparks is when employees have little or no clue as to what the executive team’s strategy is. Another example is when an unexpected risk occurs. Performance measures are too summarized, too late, and have little explanatory value to what caused their result. There are other similar types of deficiencies I could describe, but the point here is the crisis moment emerges when some motivated managers start asking, “How long do we want to perpetuate operating this way and making decisions with no or flawed and misleading data, measures, and financial reporting?”
This is when, in my opinion, Beethoven is at his best. It begins with the first of his four orchestral movements. The music starts with a single note or a few brief chords or with a melodramatic song giving the feel of a thunderstorm or being lost in a blinding snow storm.
Struggle
The next stage of heroics in Beethoven’s works is the struggle. How do we get started? What is the road map? How do we get buy-in, both from executives at the top and co-workers and employees at the bottom? How do we get funding? How do we select the correct key performance indicators (KPIs)? How do we construct an activity-based cost assignment model? How many activities should we divide our processes into? Where do we get all the input data to feed our systems? Do we even have the data? If we have the data, are there quality and integrity problems with it? Is the data scattered about in disconnected and disparate data sources?
Life and work can be a struggle.
How did Beethoven compose his music to deal with this phase in his second and third movements? Sometimes moody. Sometimes sad.
Triumph
Not everyone wins. It is so tragic to me when during my international travels for SAS that I visit an organization that initiated and even completed an analytics-based EPM system, like activity-based costing; and then they abandoned it. An executive pulled the plug on it. They may have concluded it is not worth the administrative effort to collect, calculate, and report the information (meaning someone excessively over-engineered the system and made it unnecessarily complex). Alternatively the methodology may be something a new executive does not understand.
But you can triumph and win.
Beethoven provides us with the thrill of triumph in his fourth and last movement. The decibels grow louder. The chords are crisper. At this point you want to march with your feet to his music.
What are critical success factors to implement analytics-based EPM?
What does it take to triumph in successfully implementing a performance management framework of methodologies? A few tips. Do not over-plan and under-execute. Analysis paralysis or brain-freeze. Just get going. Make mistakes early and often, to learn from, and not later when it is costly to make changes. Also, organizations often under-estimate the magnitude of peoples’ resistance to change. They need for behavioral change management.
So, how successful would Beethoven have been implementing analytics-based EPM? Read my article, Beethoven’s Eroica Effect and Performance Management, and you will know my answer.
Could Beethoven Implement Analytics-based Performance Management?
Other Posts by Gary Cokins
Analytics for Creating More Choices - May 15, 2012
An Analytics Story Problem: When will two trains collide? - May 2, 2012
Please put the shower curtain inside the bathtub! - April 24, 2012
The Perils of Analysts Demanding Perfection and Precision - March 13, 2012
Analytics-based Presidential Campaigns - March 6, 2012
» Already a member? Login now to comment!
» Not a member? Register to comment!
anonim said:
KPIs are used to monitor the impact of activities in the area of focus of the organization. In this sense they can be input, process, output and outcome indicators. This reflects the ability to use the resources wisely and generate benefits as planned.
Ultimately the value added by KPIs in any sector depends on how they are used.
The moderated business community for business intelligence, predictive analyics, and data professionals.
The Predictive Analytics in the Cloud Study is complete!
Register here to access the full results of this exclsuive study on Predictive Analytics and Cloud Technology including a whitepaper, 2 webinars, multiple podcasts and more!
Stephen Baker is the author of The Numerati & a journalist with 20 years of experience at BusinessWeek. More »
Paul Barsch directs professional services marketing programs for Teradata and has more than fifteen years of information... More »
Gary Cokins is an internationally recognized expert, speaker, and author. More »
Jill Dyché is an internationally recognized author, speaker, and business consultant. More »
Themos Kalafatis has worked as a consultant for Data Mining, Text Mining, Information Extraction and Data Quality for over a decade. More »
James Taylor is CEO and Principal Consultant at Decision Management Solutions and a leading expert in decision management. More »
SmartData Collective
- YOU
- Dean Abbott
- Teradata AusNZ
- Paul Barsch
- Meta S. Brown
- Jason Burke
- Gary Cokins
- Ted Cuzzillo
- Barry Devlin
- Chris Dixon
- Jill Dyché
- Timo Elliott
- Teradata EMEA
- Teradata Experts
- Michael Fauscette
- Bill Franks
- Bob Gourley
- Julie Hunt
- Doug Lautzenheiser
- Jack Mason
- Darryl McDonald
- Alex Olesker
- David Smith
- James Taylor
- Daniel Tunkelang
HR & Workforce Analytics Innovation Summit
When: Wed, 2012-05-23 08:00
Business Analytics Innovation Summit
When: Wed, 2012-05-23 08:00
Salford Analytics and Data Mining Conference
When: Thu, 2012-05-24 12:09
Information management and governance for the public services
When: Fri, 2012-05-25 08:00
Disruptive Technologies & Innovation Minds 2012
When: Mon, 2012-06-18 09:00
Advanced Analytics for Retail
When: Thu, 2012-06-21 08:00
Advanced Analytics for Consumer Goods
When: Thu, 2012-06-21 08:00
CIMI.Con Evolution 2012
When: Mon, 2012-06-25 08:00
Predictive Analytics World, June 25-26, 2012 in Chicago
When: Mon, 2012-06-25 09:00
Big Data for Enterprise USA 2012
When: Wed, 2012-06-27 08:00

About Social Media Today


